INSP-Final Inspection | 5/23/2014 | 5/23/2014 | 5/23/2014 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work passed final walkthrough. Permit finaled.
|
INSP-Sprinkler Rough-in | 4/24/2014 | 4/24/2014 | 4/24/2014 | A | PART |
Forrest France
|
|
|
Fire sprinkler work okayed for cover at the grid ceiling areas.
|
Permit Ready to Issue | | | 4/16/2014 | | |
|
|
|
|
Issue and Print Permit | | | 4/16/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/16/2014 | | 4/16/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 4/14/2014 | | 4/14/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/14/2014 | | 4/14/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/14/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 4/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 11 2014 12:20PM
|