INSP-Final Inspection | 5/9/2014 | 5/9/2014 | 5/9/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 5/5/2014 | 5/5/2014 | 5/5/2014 | A | PART |
Forrest France
|
|
|
Regarding coverage adjustments due to light fixture relocations.
|
INSP-Sprinkler Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PASS |
Forrest France
|
|
|
Overhead work at the remodeled conference room approved for cover.
|
Permit Ready to Issue | | | 4/24/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 4/24/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 4/24/2014 | | 4/24/2014 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 4/23/2014 | | 4/23/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 4/21/2014 | | 4/21/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/21/2014 | | 4/21/2014 | | FAIL |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 4/15/2014 | | 4/15/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/15/2014 | | 4/15/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 4/15/2014 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 4/13/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 13 2014 11:56AM
|