INSP-Final Inspection | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete.
|
INSP-Conference | 7/17/2015 | 7/20/2015 | 7/20/2015 | P | CANC |
Jim Page
|
|
|
Spoke with point of contact, Tony with Shilo Fire Protection, Phone #: ###-####. Conference was for JUMP project, not Zions Bank Building 7th floor. Cancelled this consult per conversation with Tony, not the correct location or FIR number, will call for a reschedule with correct FIR number.
|
INSP-Sprinkler Rough-in | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | PART |
Forrest France
|
|
|
Scope of fire sprinkler work at the grid ceilings approved for cover.
|
Plan assigned to (Tim) | 4/21/2014 | | 4/21/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/21/2014 | | 4/21/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/21/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 4/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 4/21/2014 | | 4/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 4/18/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2014 11:59AM
|