INSP-Final Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 | P | PASS |
Forrest France
|
|
|
Record drawings accepted. Fire sprinkler work passed final inspection. Permit finaled.
|
INSP-Final Inspection | 6/30/2014 | 6/30/2014 | 7/1/2014 | P | PART |
Forrest France
|
|
|
Scope of work is finished. Need to provide as builts for field modifications prior to final.
|
INSP-Sprinkler Rough-in | 6/12/2014 | 6/13/2014 | 6/13/2014 | A | PART |
Forrest France
|
|
|
Overhead install at the kitchen and bakery areas per the scope of work passed rough-in inspection. * Need to provide a QR head in the bakery cooler.
|
INSP-Sprinkler Rough-in | 5/22/2014 | 5/22/2014 | 5/22/2014 | P | PART |
Forrest France
|
|
|
Intended for FIR14-00241
|
Plan assigned to (Tim) | 4/23/2014 | | 4/23/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/23/2014 | | 4/23/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/23/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 4/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 4/23/2014 | | 4/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 4/23/2014 | | 4/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 4/23/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 4/22/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 22 2014 1:03PM
|