INSP-Final Inspection | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Craig D. Hanson
|
|
|
Spinkler system final. ok
|
INSP-Sprinkler Rough-in | 5/28/2014 | 5/29/2014 | 5/29/2014 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the remodel area passed rough-in. Need to re-insulate for cold cavity protection as discussed prior to final.
|
Plan assigned to (Tim) | 4/29/2014 | | 4/29/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/29/2014 | | 4/29/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/29/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2014 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 4/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 4/29/2014 | | 4/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 4/24/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2014 1:16PM
|