Case Summary | | | 2/3/2015 | | |
|
|
|
|
INSP-Final Inspection | 10/20/2014 | 10/21/2014 | 10/21/2014 | A | PASS |
Forrest France
|
|
|
Completed functional testing of notification appliances, verified monitoring, riser supervision, trouble condition. Documents cabinet posted. Fire alarm permit finaled.
|
INSP-Final Inspection | 10/8/2014 | 10/9/2014 | 10/9/2014 | P | PART |
Forrest France
|
|
|
Verified plan modification, netcon rating, additions and relocations of both notification and initiation devices per notes. Final pending functional testing of a/v's, need access to riser room, post documents cabinet, coordinate audible testing with building occupants advance of inspection as discussed.
|
Alarm Plan Check | 9/29/2014 | | 9/29/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/29/2014 | | DONE |
|
|
|
Plan modification review approved with review comments and requirements. Plans taken to front desk for processing.
|
Permit Ready to Issue | | | 9/29/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 9/29/2014 | | 9/29/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Lee) | 9/15/2014 | | 9/29/2014 | | DONE |
Lee G Meredith
|
|
|
|
Plan resubmittals received | | | 9/25/2014 | | DONE |
Tisha Gallop
|
|
|
received application and two coipes of plans; routed to Fire.
|
Alarm Plan Check | 9/16/2014 | | 9/16/2014 | | FAIL |
Lee G Meredith
|
|
|
Numerous errors on notification circuits and claculations. Resubmittal required. See review comments.
|
Telephone call | | | 9/16/2014 | | DONE |
Candy A. Nichols
|
|
|
called Mountain Alarm to let know they need to come pick up the plans that have failed
|
Miscellaneous action | | | 9/16/2014 | | DONE |
|
|
|
contractor picked up failed plans
|
Plan resubmittals received | | | 9/15/2014 | | |
|
|
|
received two copies of plans and application-routed to FIR
|
INSP-Conference | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | DONE |
Forrest France
|
|
|
|
INSP-Final Inspection | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | FAIL |
Forrest France
|
|
|
Items noted include; netcon of 7 at the time of inspection, need to provide addtional notification at some areas on the 3rd and 2nd floors, relocate MP at the 3rd floor NE exit, verify sync between EST and system sensor brand notification devices in suite 275. Provide a plan modification for resubmittal to include all field changes such as added power supplies, added SD, matrix change for deletion of elevator recall, correct zones at panel, added notification devices throughout all three floor levels, floorplan changes, etc. Approved plan set to match field install.
|
Telephone call | | | 6/17/2014 | | DONE |
|
|
|
I received a phone call from the property manager - Linda Cockerham. She was upset with the installing contractor submitting a change order for elevator recall. She indicated that although there were smoke detectors at each elevator lobby, the elevator is not capable of recall. She indicated that the owner does not feel that he should have to provide this at this time. I informed her that I don't have the authority to dismiss the issue and that she will need to contact the state elevator inspectors office to determine what needs to be done. She indicated that the elevator 5 year inspection will be conducted later this month. I told her that the outcome of that test may provide her the answers to her questions.
|
Telephone call | | | 6/17/2014 | | DONE |
|
|
|
I received a call from Brett anderson of Mountain alarm indicating that the existing elevators do not have recall and are not capable of it. I informed him that this is a matter for the elevator inspector. He said that he was concerned that if there were detectors in the lobbies that it would imply the recall function exists (even though that's the way it is now). I informed him that in the past, where the elevator needed an upgrade to allow recall, that the contractors have installed the required equipment in anticipation of future upgrades. Either way, I informed him that he will need to involve the elevator inspectors office to determine current requirements.
|
Issue and Print Permit | | | 6/5/2014 | | DONE |
|
|
|
|
Alarm Plan Check | 6/4/2014 | | 6/4/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/4/2014 | | DONE |
|
|
|
Plans approved with review comments and drawing notes.
|
Telephone call | | | 6/4/2014 | | DONE |
Christina Prado
|
|
|
called Bret to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 6/4/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 6/4/2014 | | 6/4/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 4/28/2014 | | 6/4/2014 | | DONE |
Lee G Meredith
|
|
|
|
Meeting | | | 6/2/2014 | | DONE |
|
|
|
Brett Anderson of Mountain Alarm stopped by to discuss corridor spacing & candela settings prior to his 3rd submittal on this project. I told him that his areas of concern appear to be adequate.
|
Plan resubmittals received | | | 6/2/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets, applications, checklists and related documents
|
Plan resubmittals received | | | 5/29/2014 | | DONE |
Candy A. Nichols
|
|
|
received two sets of plans (FA-1,FA-2,FA-3 & FA-4). Put in Fire Box
|
Alarm Plan Check | 5/29/2014 | | 5/29/2014 | | FAIL |
Lee G Meredith
|
|
|
See 2nd review comments 5-28-14
|
Miscellaneous action | | | 5/29/2014 | | DONE |
|
|
|
Emailed review comments to applicant.
|
Miscellaneous action | | | 5/6/2014 | | DONE |
|
|
|
I received an email from the property manager (Linda Cockerham of Select Commercial Property Services) requesting the the process for persuing an upgrade agreement. I responded via email indicating that she would need to compose a letter of request to Romeo Gervais & Jason Blais that lays out her situation and her plans with timeline for completion.
|
Meeting | | | 5/5/2014 | | DONE |
|
|
|
Landlord / property manager stopped by City Hall to discuss the possibility of phasing the upgrade requirements noted in the review comments over time to prevent an instant increase in cost of $10,000 to the initially proposed project. I informed her that it may be possible to have a phased upgrade agreement, if approved by the fire marshal. She will email me her contact info so I can send her the requirements of the request process.
|
Telephone call | | | 4/30/2014 | | DONE |
Christina Prado
|
|
|
called bret to advise failed plans are waiting for pick up. He resopnded to let me know he will go over the requirements with the owner and resubmit when changes are approved.
|
Miscellaneous action | | | 4/29/2014 | | DONE |
|
|
|
Emailed review comments to applicant for correction and resubmittal.
|
1st review completed | | | 4/29/2014 | | FAIL |
|
|
|
See 1st review comments dated 4-29-14.
|
Alarm Plan Check | 4/28/2014 | | 4/29/2014 | | FAIL |
Lee G Meredith
|
|
|
Emailed review comments to applicant for correction and resubmittal.
|
Application received | | | 4/28/2014 | | |
|
|
|
|