INSP-Final Inspection | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Final Inspection | 5/29/2014 | 5/29/2014 | 5/29/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit approved for final once escutcheons are installed.
|
INSP-Final Inspection | 5/16/2014 | 5/19/2014 | 5/19/2014 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications and additions at the first floor and mezzanine levels passed rough-in- Okayed for cover.
|
(F) Reprint permit | | | 5/15/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/15/2014 | | 5/15/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 5/12/2014 | | 5/12/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/12/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/12/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/12/2014 | | 5/12/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 5/7/2014 | | 5/7/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/7/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/7/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 5/6/2014 | | 5/6/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 4/29/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2014 4:05PM
|