INSP-Final Inspection | 9/8/2014 | 9/10/2014 | 9/10/2014 | A | PASS |
Forrest France
|
|
|
Remainder of fire alarm modifications at the final phase passed inspection and functional testing. Permit finaled.
|
INSP-Alarm Testing | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | PART |
Forrest France
|
|
|
Fire alarm work at the second floor remodel areas phase 2 and 3 passed functional testing and inspection.
|
INSP-Alarm Testing | 6/3/2014 | 6/5/2014 | 6/5/2014 | A | PART |
Forrest France
|
|
|
Phase one area at the NW corner passed fire alarm testing and inspection per the scope of work indicated.
|
Permit Ready to Issue | | | 5/2/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 5/2/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 5/2/2014 | | 5/2/2014 | | DONE |
Barbara Stitt
|
|
|
|
1st review completed | | | 5/1/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 5/1/2014 | | 5/1/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/1/2014 | | DONE |
|
|
|
Plans approved with comments. Projectdox updated.
|
Application received | | | 4/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 30 2014 11:39AM
|
Plan assigned to (Lee) | 4/30/2014 | | 4/30/2014 | | DONE |
Lee G Meredith
|
|
|
|