INSP-Final Inspection | 9/10/2014 | 9/10/2014 | 9/10/2014 | A | PASS |
Forrest France
|
|
|
Final walkthrough and inspection completed satisfactory. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PART |
Forrest France
|
|
|
Fire sprinkler work at phase four
|
INSP-Final Inspection | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | PART |
Forrest France
|
|
|
Fire sprinkler work in both phase two and three passed walkthrough and inspection.
|
INSP-Final Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work at the clouded areas as marked and dated on approved plans in phase two and three approved for ceiling cover.
|
INSP-Final Inspection | 6/3/2014 | 6/5/2014 | 6/5/2014 | A | PART |
Forrest France
|
|
|
"Phase one" at the NW quadrant passed overhead rough-in inspection.
|
Sprinkler Plan Check | 5/8/2014 | | 5/8/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/8/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/8/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/8/2014 | | 5/8/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 5/6/2014 | | 5/6/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/6/2014 | | 5/6/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/6/2014 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 5/5/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 5 2014 2:07PM
|