INSP-Final Inspection | 6/25/2014 | 6/26/2014 | 6/26/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/25/2014 | 6/25/2014 | 6/25/2014 | P | CANC |
Forrest France
|
|
|
Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 6/24/2014 | 6/25/2014 | 6/25/2014 | A | CANC |
Forrest France
|
|
|
Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 5/13/2014 | 5/14/2014 | 5/14/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered
|
Plan assigned to (Tim) | 5/9/2014 | | 5/9/2014 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/9/2014 | | PEND |
|
|
|
On hold waiting confirmation of unit. Requested via email on 5/09/2014
|
Sprinkler Plan Check | 5/9/2014 | | 5/9/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/9/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/9/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/9/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/9/2014 | | 5/9/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2014 11:42AM
|