INSP-Final Inspection | 12/3/2014 | 12/4/2014 | 12/4/2014 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 12/3/2014 | 12/3/2014 | 12/3/2014 | A | DONE |
Troy Cobbley
|
|
|
Finished except for the supervisory signals, low air and tamper, from the pre-action system.
|
INSP-Alarm Testing | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | DONE |
Troy Cobbley
|
|
|
Fire alarm in the Locker Rooms/Storage/PACU areas is complete.
|
INSP-Alarm Testing | 8/15/2014 | 8/18/2014 | 8/18/2014 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where minor corrections and retesting are required.
|
INSP-Alarm Testing | 8/13/2014 | 8/15/2014 | 8/15/2014 | A | PART |
Craig D. Hanson
|
|
|
Rough in OK. Phase 2 complete. Could not test alarms no pre-tested inspection documention.
|
INSP-Alarm Testing | 8/11/2014 | 8/14/2014 | 8/13/2014 | A | CANC |
Troy Cobbley
|
|
|
As early as possible Phone #: 2089411846 >> Inspection requested via mobile web by Brian A Inspection cancelled via mobile web on Wednesday, August 13, 2014.
|
INSP-Alarm Testing | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | DONE |
Troy Cobbley
|
|
|
Lab, Equipment Room and Lobby fire alarm is complete.
|
Miscellaneous action | | | 6/6/2014 | | DONE |
|
|
|
I received a drawing from Dante Frassa showing the removal of a strobe in the MRI and notation indicating the reasons. I uploadeded it into Tidemark.
|
Telephone call | | | 6/5/2014 | | DONE |
|
|
|
Dante Frassa called to request the removal of the strobe in the MRI room due to the fact that when the MRI is operating it will cause interference with the fire alarm system. He said that the only time that the room is occupied, there is a medical staff person observing from the control room that is covered with notification. I informed him that this would be acceptable. He will note the change on as built drawings.
|
Permit Ready to Issue | | | 5/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 5/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 5/29/2014 | | 5/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 5/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Alarm Plan Check | 5/28/2014 | | 5/28/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/28/2014 | | DONE |
|
|
|
Plans approved with review comments.
|
Plan resubmittals received | | | 5/27/2014 | | DONE |
|
|
|
|
Miscellaneous action | | | 5/14/2014 | | DONE |
|
|
|
I received an email from Dante. He indicated that the preaction field equipment is existing and that they are adding a new panel and controls. The room that is covered is C159 - Files. Kitchen hood is existing also.
|
Telephone call | | | 5/14/2014 | | DONE |
|
|
|
Called Dante and confirmed that the pre-action system for Files Room 159 is water based.
|
1st review completed | | | 5/14/2014 | | FAIL |
|
|
|
See plan review comments.
|
Miscellaneous action | | | 5/14/2014 | | DONE |
|
|
|
Emailed review comments to Dante.
|
Miscellaneous action | | | 5/13/2014 | | DONE |
|
|
|
Email to Dante. Drawing shows preaction equipment with abort switch but doesn't indicate the are being protectied. Need to know what the suppression medium is and if there is pre-alarm notification. Also, there is a kitchen hood that is not indicated on the legend. Need to know if this is existing or new. I let him know that if it is new, it will need a seperate permit.
|
Plan assigned to (Lee) | 5/12/2014 | | 5/12/2014 | | DONE |
Lee G Meredith
|
|
|
|
Application received | | | 5/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2014 4:59PM
|