INSP-Final Inspection | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Sprinkler Rough-in | 7/25/2014 | 7/24/2014 | 7/24/2014 | A | PART |
Craig D. Hanson
|
|
|
Inspection request was for rough-in/cover of underground supply. Performed previous day by field inspector.
|
INSP-Sprinkler Rough-in | 5/16/2014 | 5/16/2014 | 5/16/2014 | P | PART |
Craig D. Hanson
|
|
|
Underground line passed. CDH 05/16/14
|
Plan assigned to (Tim) | 5/14/2014 | | 5/14/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/14/2014 | | 5/14/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/14/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/14/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/14/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/14/2014 | | 5/14/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 11 2014 3:23PM
|