INSP-Final Inspection | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | PASS |
Forrest France
|
|
|
Verified correct temp heads in the mechanical closets.
|
INSP-Final Inspection | 8/6/2014 | 8/7/2014 | 8/7/2014 | A | FAIL |
Troy Cobbley
|
|
|
Need the correct temp heads in the mech closets.
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2014 | 6/20/2014 | 6/20/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead rough-in passed. Tenting passed. Overhead hydro test passed. Piping can be covered.
|
INSP-Supply line flush | 6/19/2014 | 6/19/2014 | 6/19/2014 | P | PASS |
Troy Cobbley
|
|
|
Supply line flush passed
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2014 | 6/19/2014 | 6/19/2014 | P | CANC |
Troy Cobbley
|
|
|
Robert Phone #: ###-#### Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 5/28/2014 | 5/28/2014 | 5/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground piping is ok to cover
|
Sprinkler Plan Check | 5/16/2014 | | 5/16/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2014 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 5/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 5/16/2014 | | 5/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Tim) | 5/14/2014 | | 5/14/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/14/2014 | | 5/14/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/14/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/14/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 5/13/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 13 2014 9:46AM
|