Permit Information
Permit NumberFIR14-00289
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 1050 W RIVER ST
Project NameIntralot Sprinkler Adds
Customer Number 
ePlanReviewYes
Description
Intralot is an small TI in an existing sprinklered building; Add 4 new sprinkler to a new enclosed electrical room. The existing warehouse has existing upright sprinkler. Connect to existing 2" branchlines and drop down to the electrical room.

The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

(CWI Surgical)(Multiple Permits)Tenant improvements of the 1st floor existing Quail Court building to facilitate the surgical technician program for The College of Western Idaho at the Blackeagle Center commercial subdivision. This is a no ambulatory facility see letter in file from school. No surgery will take place this is the learning environment for medical assistants. Scope of work to include minor demolition. New tenant space will have new nonbearing noncombustible walls to create 1 storage room, 1 conference room and an accessible locker area. Associated plumbing, mechanical and electrical included in scope of permit. New ceiling grid to be installed. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/23/20146/23/20146/23/2014PPASS
DetailsForrest France
Final walkthrough passed after adjustments made while on site- (pendent/HVAC diffuser) location.
INSP-Sprinkler Rough-in5/27/20145/27/20145/27/2014PPART
DetailsForrest France
Fire sprinkler work passed rough-in inspection.
Permit Ready to Issue  5/16/2014 DONE
DetailsChristina Prado
Issue and Print Permit  5/16/2014 DONE
DetailsChristina Prado
Inspection Record Card- Fire5/16/2014 5/16/2014 DONE
DetailsChristina Prado
Plan assigned to (Tim)5/15/2014 5/15/2014 DONE
DetailsTim Frost
Sprinkler Plan Check5/15/2014 5/15/2014 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  5/15/2014 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/15/2014 DONE
DetailsTim Frost
Application received  5/14/2014 DONE
Application submitted via PDS Online on May 14 2014 11:23AM