INSP-Final Inspection | 6/23/2014 | 6/23/2014 | 6/23/2014 | P | PASS |
Forrest France
|
|
|
Final walkthrough passed after adjustments made while on site- (pendent/HVAC diffuser) location.
|
INSP-Sprinkler Rough-in | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PART |
Forrest France
|
|
|
Fire sprinkler work passed rough-in inspection.
|
Permit Ready to Issue | | | 5/16/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/16/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/16/2014 | | 5/16/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 5/15/2014 | | 5/15/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/15/2014 | | 5/15/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/15/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 5/14/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2014 11:23AM
|