INSP-Final Inspection | 6/3/2014 | 6/3/2014 | 6/3/2014 | P | PASS |
Forrest France
|
|
|
Rough-in and final inspections completed. Fire sprinkler permit finaled.
|
Permit Ready to Issue | | | 5/21/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/21/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/21/2014 | | 5/21/2014 | | DONE |
Christina Prado
|
|
|
|
Miscellaneous action | | | 5/20/2014 | | DONE |
|
|
|
Two reference plans were submitted. They both only show 7 sprinklers supply from 1 1/4" However, there is a 74# cushion. Therefore, the plans were approved.
|
Sprinkler Plan Check | 5/20/2014 | | 5/20/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 5/19/2014 | | 5/19/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 5/16/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 16 2014 12:12PM
|