INSP-Final Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Jim Page
|
|
|
Standpipe inspected, passed/complete
|
INSP-Final Inspection | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Thomas Walsh
|
|
|
Final inspection of standpipes for wings A and B. PASSED
|
Sprinkler Plan Check | 6/26/2014 | | 6/26/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 6/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 6/26/2014 | | 6/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 6/16/2014 | | 6/16/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/16/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 5/30/2014 | | 5/30/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/30/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/30/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 5/28/2014 | | 5/28/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 5/27/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 27 2014 3:13PM
|