Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR14-00312
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 3830 S COUNCIL SPRING RD
Project NameTerraces of Boise, Standpipe B
Customer Number 
ePlanReviewYes
Description
The fire protection scope of work consists of (2) manual wet standpipes.

The Terraces of Boise - Main Building Wings A and B - To construct a new 50,285 square foot, four story, wood framed independent living apartment building. This is a wing of a larger building, with wings separated by two-hour fire walls. This building is being constructed on top of an underground parking garage. The parking garage is separated from the above apartment building by a three-hour horizontal separation. This building is fully fire sprinklered. The sprinklers are used for story increase. First Floor: 14,885 sq. ft. with 11 apartments. Second Floor: 14,785 sq. ft. with 11 apartments. Third Floor: 11,865 sq. ft. with 9 apartments. Fourth Floor: 8,750 sq. ft. with 7 apartments. All floors contain mechanical/electrical and housekeeping areas. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/3/201511/3/201511/3/2015PPASS
DetailsJim Page
Standpipe inspected, passed/complete
INSP-Final Inspection6/25/20156/25/20156/25/2015PPASS
DetailsThomas Walsh
Final inspection of standpipes for wings A and B.
PASSED
Sprinkler Plan Check6/26/2014 6/26/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/26/2014 DONE
DetailsTim Frost
Permit Ready to Issue  6/26/2014 DONE
DetailsBarbara Stitt
Issue and Print Permit  6/26/2014 DONE
DetailsBarbara Stitt
Inspection Record Card- Fire6/26/2014 6/26/2014 DONE
DetailsBarbara Stitt
Sprinkler Plan Check6/16/2014 6/16/2014 FAIL
DetailsTim Frost
Miscellaneous action  6/16/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check5/30/2014 5/30/2014 FAIL
DetailsTim Frost
1st review completed  5/30/2014 FAIL
DetailsTim Frost
Miscellaneous action  5/30/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)5/28/2014 5/28/2014 DONE
DetailsTim Frost
Application received  5/27/2014 DONE
Application submitted via PDS Online on May 27 2014 3:13PM