Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR14-00313
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 3830 S COUNCIL SPRING RD
Project NameTerraces of Boise, Standpipee
Customer Number 
ePlanReviewYes
Description
Standpipe for Wings E & F
The fire protection scope of work consists of (2) manual wet standpipes.
The Terraces of Boise - Main Building Wings F and G - To construct a new 72,340 square foot, four story, wood framed independent living apartment building. This is a wing of a larger building, with building wings separated by two-hour fire walls. This building is being constructed on top of an underground parking garage. The parking garage is separated from the above apartment building by a three-hour horizontal separation. This building is fully fire sprinklered. The sprinklers are used for area and height increases. First Floor: 20,000 sq. ft. with 16 apartments and a design center. Second Floor: 21,000 sq. ft. with 15 apartments and a media area. Third Floor: 17,475 sq. ft. with 13 apartments and a small theater. Fourth Floor: 13,865 sq. ft. with 8 apartments units. All floors contain mechanical/electrical and housekeeping areas. Wings F and G will constructed as part of Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/3/201511/3/201511/3/2015PPASS
DetailsJim Page
Standpipe inspected, passed/complete
Permit Ready to Issue  6/27/2014 DONE
DetailsBarbara Stitt
Issue and Print Permit  6/27/2014 DONE
DetailsBarbara Stitt
Inspection Record Card- Fire6/27/2014 6/27/2014 DONE
DetailsBarbara Stitt
Sprinkler Plan Check6/26/2014 6/26/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/26/2014 DONE
DetailsTim Frost
Sprinkler Plan Check6/17/2014 6/17/2014 FAIL
DetailsTim Frost
Miscellaneous action  6/17/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)5/30/2014 5/30/2014 DONE
DetailsTim Frost
Sprinkler Plan Check5/30/2014 5/30/2014 FAIL
DetailsTim Frost
1st review completed  5/30/2014 FAIL
DetailsTim Frost
Miscellaneous action  5/30/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  5/27/2014 DONE
Application submitted via PDS Online on May 27 2014 3:15PM