INSP-Final Inspection | 4/10/2015 | 4/10/2015 | 4/10/2015 | P | PASS |
Forrest France
|
|
|
Plan modification verified. Scope of work completed, fire sprinkler permit finaled.
|
INSP-Final Inspection | 4/10/2015 | 4/10/2015 | 4/10/2015 | P | PART |
Forrest France
|
|
|
Please call Leroy 30 mins prior Please schedule after 3:30 Phone #: ###-#### Inspection requested via web by Jacci Hunt
|
Sprinkler Plan Check | 4/10/2015 | | 4/10/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2015 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/10/2015 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/1/2015 | | 4/1/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/1/2015 | | 4/1/2015 | | FAIL |
Tim Frost
|
|
|
|
INSP-Final Inspection | 3/27/2015 | 3/30/2015 | 3/30/2015 | P | PEND |
Forrest France
|
|
|
Refer to project activity notes dated 8/15/14
|
INSP-Final Inspection | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | NH |
Forrest France
|
|
|
No access
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2014 | 8/15/2014 | 8/15/2014 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic testing passed. Need to provide plan modification to include field changes in branchline, main and sprinkler head locations and changes to type and number of sprinklers at several locations including the work room, kitchen, office, principal office, east classroom, music office, girls restroom, and storage closets.
|
INSP-Sprinkler Rough-in | 7/31/2014 | 8/1/2014 | 8/1/2014 | A | PART |
Forrest France
|
|
|
Rough-in inspection completed for the west classroom wing as noted on plans. Missing hangers at classroom 123, lateral brace at the corridor, fire caulk at classroom 126- all corrected while on site. Need to revise spacing issues in classroom #8 room 125. Attic access room and library 130A are incomplete at this time. Remainder of classrooms and corridor are okay for cover per dated annotations.
|
INSP-Sprinkler Rough-in | 7/28/2014 | 7/30/2014 | 7/30/2014 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Roy
|
Permit Ready to Issue | | | 6/26/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 6/26/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 6/26/2014 | | 6/26/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 6/25/2014 | | 6/25/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/16/2014 | | 6/16/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/16/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 6/3/2014 | | 6/3/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/3/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/3/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 6/2/2014 | | 6/2/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 5/29/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2014 12:09PM
|