Miscellaneous action | | | 10/2/2014 | | DONE |
|
|
|
As built drawings received.
|
INSP-Final Inspection | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/29/2014 | 9/29/2014 | 9/29/2014 | A | FAIL |
Troy Cobbley
|
|
|
Need to relocate the strobe that is blocked by the cabinets.
|
INSP-Alarm Testing | 9/29/2014 | 9/29/2014 | 9/29/2014 | A | DONE |
Troy Cobbley
|
|
|
Need to relocate wall mounted a/v to the ceiling due to new cabinets obstructing the strobe. Need to retest as well.
|
INSP-Alarm Testing | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | DONE |
Troy Cobbley
|
|
|
Phase I fire alarm complete
|
Permit Ready to Issue | | | 6/2/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/2/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/2/2014 | | 6/2/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 5/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on May 30 2014 10:11AM
|
Miscellaneous action | | | 5/30/2014 | | DONE |
|
|
|
plan failed on prescreen due to inadequate detactor and strobe coverage. The applicant called to inform me that he had not scaled the drawings correctly and that a resubmittal would be done today.
|
Plan resubmittals received | | | 5/30/2014 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 5/30/2014 | | 5/30/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/30/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 5/30/2014 | | 5/30/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/30/2014 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|