INSP-Final Inspection | 10/10/2014 | 10/10/2014 | 10/10/2014 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 10/10/2014 | 10/10/2014 | 10/10/2014 | P | PASS |
Troy Cobbley
|
|
|
UG flush passed
|
INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in. Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | PART |
Forrest France
|
|
|
UG fire supply line passed hydrostatic testing.
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2014 | 7/24/2014 | 7/24/2014 | A | CANC |
Troy Cobbley
|
|
|
Troy-Underground Hydro Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/23/2014 | | DONE |
|
|
|
should not have been finaled
|
INSP-Final Inspection | 7/17/2014 | 7/18/2014 | 7/18/2014 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground piping is ok to cover.
|
INSP-Sprinkler Rough-in | 7/17/2014 | 7/17/2014 | 7/17/2014 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground is ok for cover except for the thrust blocks which will be verified tomorrow.
|
INSP-Sprinkler Rough-in | 7/15/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved underground drawings for location where the underground supply line can be buried.
|
Plan assigned to (Tim) | 6/3/2014 | | 6/3/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/3/2014 | | 6/3/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/3/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 6/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 6/3/2014 | | 6/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 6/2/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 2 2014 10:12AM
|