INSP-Final Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
Override - Parcel Holds | 6/19/2014 | 1/1/1900 | 6/19/2014 | | |
|
|
|
needs final fire inspection CAN
|
INSP-Final Inspection | 6/13/2014 | 6/16/2014 | 6/16/2014 | P | FAIL |
Troy Cobbley
|
|
|
Rough-in inspection only. Piping is ok to cover. A solid ceiling tile will be required at the pendant head in the closet.
|
Override - Parcel Holds | 6/13/2014 | 1/1/1900 | 6/13/2014 | | |
|
|
|
fir final
|
Plan assigned to (Tim) | 6/4/2014 | | 6/4/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/4/2014 | | 6/4/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/4/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/4/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 6/4/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 6/4/2014 | | 6/4/2014 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 6/4/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 6/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2014 11:18AM
|