INSP-Final Inspection | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PASS |
Forrest France
|
|
|
Final walkthrough completed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | PART |
Forrest France
|
|
|
Verified remainder of overhead work for cover at the grid ceilings throughout. Adjustments to coverage in the north and south hallways okayed.
|
INSP-Sprinkler Rough-in | 8/19/2014 | 8/19/2014 | 8/19/2014 | P | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler work at areas marked and dated on plans. Five heads at the north hall will need relocated due to cable tray obstructions, the break area south end is not yet finished- discussed light fixture obstructions at this area.
|
INSP-Sprinkler Rough-in | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at the sheetrock ceilings in the break room, coffee, and waiting areas as marked and dated on stamped plans.
|
Plan assigned to (Tim) | 6/6/2014 | | 6/6/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/6/2014 | | 6/6/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/6/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/6/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 6/6/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 6/6/2014 | | 6/6/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 6/5/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 5 2014 2:25PM
|