INSP-Final Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | PASS |
Forrest France
|
|
|
Demo permit approved for final.
|
INSP-Final Inspection | 6/19/2014 | 6/19/2014 | 6/19/2014 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually to verify that the rack piping has been removed. Per Stefan and my discussion we would leave the permit open to cover the work required to remove the hose valve.
|
Permit Ready to Issue | | | 6/13/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 6/13/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 6/13/2014 | | 6/13/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 6/12/2014 | | 6/12/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/12/2014 | | 6/12/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/12/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/6/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 6 2014 2:27PM
|