INSP-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/23/2014 | P | DEFR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 10/22/2014 | 10/23/2014 | 10/23/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2014 | 9/19/2014 | 9/19/2014 | P | PASS |
Troy Cobbley
|
|
|
The 24 hour air test on all four dry pipe systems passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test started on all four dry systems and 10:00am with the pressure marked in red on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Overhead 200lb hydro for all four new dry pipe systems passed
|
Sprinkler Plan Check | 9/15/2014 | | 9/15/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 9/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 9/15/2014 | | 9/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
INSP-Sprinkler Rough-in | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Troy Cobbley
|
|
|
Canopy 2/3 rough-in passed. Plan modifications are needed due to pipe routing changes and supply piping to the heads.
|
INSP-Sprinkler Rough-in | 8/19/2014 | 8/20/2014 | 8/20/2014 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed for System 1 (east & west) except plan modification is needed showing the additional branchline in the remote area and pipe size changes. Rough-in passed for Systems 2 and 4. System 3 has not been inspected yet. Risers have not been inspect yet.
|
Permit Ready to Issue | | | 7/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 7/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 7/25/2014 | | 7/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 7/24/2014 | | 7/24/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/17/2014 | | 7/17/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/17/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/17/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Miscellaneous action | | | 7/17/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 7/16/2014 | | 7/16/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/9/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 9 2014 7:35AM
|