Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR14-00362
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 5301 E WARM SPRINGS AVE
Project NameThe Terraces ABC & D Parking
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting wings A, B, C& D parking level. This review also includes a fire pump room with a 400 Gpm @ 90 Psi fire pump with associated piping and valves.
The Terraces of Boise - Garage #1 - To construct a new 30,480 square foot basement parking garage. This is a portion of a larger parking garage below a four story multi-family residential, elderly housing building. This portion of the underground garage is below building sections A, B and C. This portion of the garage contains two elevators and elevator machine room and an electrical/communications room. This garage is below a three-hour fire-resistive horizontal separation. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/201510/14/201510/15/2015PPASS
DetailsThomas Walsh
Final Inspection passed. All previous discrepancies corrected.
INSP-Final Inspection6/25/20156/25/20156/25/2015PPASS
DetailsThomas Walsh
Final inspection for wings A-D parking garage, including fire pump room.
PASSED
INSP-Sprinkler Rough-in/Hydro6/12/20156/12/20156/12/2015PPASS
DetailsThomas Walsh
Final Inspection of under ground parking for wings A, B C, including the fire pump room. All fire alarm interface, such as waterflow and tampers were tested with the fire alarm system. Riser placards were applied. No discrepancies remained for this portion of the overall system.
INSP-Final Inspection6/10/20156/11/20156/11/2015APART
DetailsThomas Walsh
Final inspection of U/G parking garage wet system.
NOTE: Fire caulking needed at stair # 3 pipe penetration. Also need to inspect fire pump room, as this room is under this permit.
INSP-Sprinkler Rough-in/Hydro6/9/20156/10/20156/10/2015APASS
DetailsThomas Walsh
Boise PDS witnessed fire pump test (Tim Frost and Tom Walsh), incuding pump flow tests to record proper flows and pressures at various stages of the pump operations, also phase reversal, and fire alarm system interface.
All tested OK - final fire pump signoff will require room upgrades (1 hour room), including fire rated door installed, emergency lighting, wall penetrations fire stopped, etc. Also all weather sign on exterior of pump room door.
Miscellaneous action  6/10/2015 DONE
Performed a miniature fire pump test to verify additional information. The city was not notified of the fire pump test performed by the manufacture representative. The fire pump is rated at 400 Gpm @ 90 Psi, City flow test indicate S-70, R-20, Q-3000

Test as follow
Churn - Inlet had Static of 75 psi outlet was 175 psi
Rate Flow was – 5 pitot from a 2.5” = 333 Gpm, Inlet was 70 Psi and Outlet was 157 Psi
150% was – 11 pitot from a 2.5” = 495 Gpm, Inlet was 67 Psi and Outlet was 134 Psi
The fire pump performed less than anticipated however, the city flow test is more than originally assumed. Therefore, I believe the supply is adequate
INSP-Final Inspection6/5/20156/8/20156/8/2015PPART
DetailsThomas Walsh
Inspection of fire alarm system interface, including water flows of system risers, tamper devices, control valves, etc. Waterflows came in at approx. 30-40 seconds.All pump room tampers tested OK. All device addresses appeared accurate.
Miscellaneous action  5/15/2015 PEND
** FIELD INSPECTOR ** A resubmittal of the pump arrangment is required before this permit can be finaled.
INSP-Sprinkler Rough-in/Hydro4/21/20154/21/20154/23/2015PCANC
DetailsKatie Marron
Cancelled overbooked, rescheduled for later date.
Sprinkler Plan Check8/4/2014 8/4/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  8/4/2014 DONE
DetailsTim Frost
Permit Ready to Issue  8/4/2014 DONE
DetailsCandy A. Nichols
Issue and Print Permit  8/4/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Fire8/4/2014 8/4/2014 DONE
DetailsCandy A. Nichols
(F) Reprint permit  8/4/2014 DONE
DetailsCandy A. Nichols
Miscellaneous action  7/29/2014 DONE
Sent an email to Trent at Phoenix Fire Protection asking him if he has contacted the GC in regards to the Fire Pump room requirments.
Miscellaneous action  7/29/2014 DONE
Contacted the project manger and informed him there is a potential problem in regards to the Fire Pump room. I informed him there are several provisions of NFPA 20 and IFC that must be addressed in regards to the construction of the fire pump room. I sent him my review and a copy of the fire pump room drawing.
Sprinkler Plan Check7/18/2014 7/18/2014 FAIL
DetailsTim Frost
Miscellaneous action  7/18/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check6/20/2014 6/20/2014 FAIL
DetailsTim Frost
1st review completed  6/20/2014 FAIL
DetailsTim Frost
Miscellaneous action  6/20/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)6/20/2014 6/20/2014 DONE
DetailsTim Frost
Application received  6/11/2014 DONE
Application submitted via PDS Online on Jun 11 2014 10:04AM