INSP-Final Inspection | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PART |
Forrest France
|
|
|
UG fire supply line passed hydrostatic test.
|
INSP-Sprinkler Rough-in/Hydro | 9/9/2014 | 9/11/2014 | 9/10/2014 | A | CANC |
Forrest France
|
|
|
Jeff is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Supply line flush | 9/4/2014 | 9/5/2014 | 9/5/2014 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed. Alot of rust in line
|
INSP-Sprinkler Rough-in | 6/27/2014 | 6/27/2014 | 6/27/2014 | P | PART |
Forrest France
|
|
|
Fire supply line including the IBR and PIV okayed for bury.
|
INSP-Sprinkler Rough-in | 6/26/2014 | 6/27/2014 | 6/27/2014 | A | CANC |
Forrest France
|
|
|
This is an ug to cover. Bryan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 6/19/2014 | 6/20/2014 | 6/19/2014 | A | CANC |
Forrest France
|
|
|
This is an ug to cover. Bryan is the contact.Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Sprinkler Plan Check | 6/17/2014 | | 6/17/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/17/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 6/17/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 6/17/2014 | | 6/17/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Tim) | 6/13/2014 | | 6/13/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/13/2014 | | 6/13/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/13/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/13/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 6/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 11 2014 10:52AM
|