INSP-Final Inspection | 8/15/2014 | 8/15/2014 | 8/15/2014 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work passed final walkthrough. Permit finaled.
|
INSP-Final Inspection | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | PART |
Forrest France
|
|
|
Pharmacy area remodel and coffee shop kiosk both passed final walkthrough. Final pending one demo head per plans. Noted existing fire sprinkler system appears overdue annual certification and inspection.
|
INSP-Final Inspection | 7/18/2014 | 7/18/2014 | 7/21/2014 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for monday per Don Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/1/2014 | 7/2/2014 | 7/2/2014 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the new cart storage wall okayed for cover.
|
INSP-Sprinkler Rough-in | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PART |
Forrest France
|
|
|
Overhead rough-in for branchlines and armovers at the new pharmacy area drop and sheetrock lid ceilings passed inspection. *Drops and grid work not yet installed. Plans dated and initialed.
|
Permit Ready to Issue | | | 6/27/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 6/27/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 6/27/2014 | | 6/27/2014 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 6/26/2014 | | 6/26/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/26/2014 | | FAIL |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/26/2014 | | 6/26/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 6/25/2014 | | 6/25/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 12 2014 12:19PM
|