DOC - Permit Finaled | | | 7/11/2014 | | DONE |
|
|
|
|
INSP-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PASS |
Craig D. Hanson
|
|
|
sprinkler system tested and passed
|
INSP-Final Inspection | 7/8/2014 | 7/8/2014 | 7/8/2014 | P | CANC |
Troy Cobbley
|
|
|
Not ready for final due to tampers and flow not tied to new fire alarm panel.
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2014 | 7/8/2014 | 7/8/2014 | P | PASS |
Troy Cobbley
|
|
|
Hydro test passed. Forward flush passed. Rough-in passed. Adam was installing bags on heads.
|
Sprinkler Plan Check | 7/3/2014 | | 7/3/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/3/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 7/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 7/3/2014 | | 7/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 6/27/2014 | | 7/2/2014 | | FAIL |
Tim Frost
|
|
|
Failed PreScreen
Submitted spray paint booths as dry system instead of wet or deluge.
|
Plan assigned to (Tim) | 6/27/2014 | | 6/27/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 12 2014 12:27PM
|