INSP-Final Inspection | 8/1/2014 | 8/1/2014 | 8/1/2014 | P | PASS |
Forrest France
|
|
|
Scope of work completed. Fire sprinkler permit passed final walkthrough.
|
INSP-Sprinkler Rough-in | 7/17/2014 | 7/17/2014 | 7/17/2014 | P | PART |
Craig D. Hanson
|
|
|
1st floor behind clerks office and 1st floor West side office area inspected and passed. OK to cover. CDH
|
INSP-Sprinkler Rough-in | 7/15/2014 | 7/15/2014 | 7/15/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for area on the third floor that is ok for the piping to be covered.
|
INSP-Sprinkler Rough-in | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for second floor locations where the piping is ok to cover.
|
INSP-Sprinkler Rough-in | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | DEFR |
Forrest France
|
|
|
Overbooked
|
Plan assigned to (Scott) | 7/9/2014 | | 7/9/2014 | | DONE |
Scott Arellano
|
|
|
Plan re-assigned to Scott
|
Sprinkler Plan Check | 7/9/2014 | | 7/9/2014 | | PASS |
Scott Arellano
|
|
|
Plans approved. No separate comments attached.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/9/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 7/9/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/9/2014 | | 7/9/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 7/2/2014 | | 7/2/2014 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 7/2/2014 | | DONE |
|
|
|
Project on hold per Contractor
|
Application received | | | 6/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 23 2014 12:48PM
|