INSP-Final Inspection | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | CANC |
Troy Cobbley
|
|
|
Canceled per Nathan Price and my discussion.
|
INSP-Final Inspection | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet but we did verify that the flow switch and single tamper switch to the three story office was functional. We stopped the inspection after this due to installation (addresses/physical location) did not match the approved plans. As-bults are needed. I noted that not all manual pull stations meet height requirements of NFPA 72 and will need to be corrected. No testing of the suppression system was performed. FACP panel/batteries/power supply was verified. Need breaker labeling and lockout.
|
INSP-Final Inspection | 8/21/2014 | 8/25/2014 | 8/24/2014 | A | CANC |
Troy Cobbley
|
|
|
Phone #: 2089414511 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Sunday, August 24, 2014.
|
INSP-Final Inspection | 8/21/2014 | 8/22/2014 | 8/21/2014 | A | CANC |
Troy Cobbley
|
|
|
Phone #: 2089414511 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Thursday, August 21, 2014.
|
Telephone call | | | 7/16/2014 | | DONE |
|
|
|
Charlie Bayne called to say that they will be deleting a couple of the notificaiton device and relocating 1 notification device in hangar 1. These devices are not required. As built drawings will reflect the changes.
|
Inspection Record Card- Fire | 6/26/2014 | | 6/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 6/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 6/26/2014 | | 6/26/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Lee) | 6/25/2014 | | 6/25/2014 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 6/25/2014 | | DONE |
|
|
|
Requested detection installation heights from Dante via email. He responded via email indicating installation height of sprinkler brantches. Verification with Tim Frost shows that to be a maximum of 33'9" and a minimum of 30'9".
|
Miscellaneous action | | | 6/25/2014 | | DONE |
|
|
|
Prior to approval, I noticed in the phase 1 inspection comments that the communicator was changed from a DACT to a wireless. I requested product data and drawing modifications from Dante. He provided them & I added them to the project.
|
Alarm Plan Check | 6/25/2014 | | 6/25/2014 | | PASS |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/25/2014 | | PASS |
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/25/2014 | | DONE |
|
|
|
Plans approved with drawing notes and review comments. Projectdox updated.
|
Application received | | | 6/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 23 2014 4:03PM
|