INSP-Final Inspection | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | PASS |
Troy Cobbley
|
|
|
OH hydro passed
|
INSP-Supply line flush | 9/30/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | CANC |
Troy Cobbley
|
|
|
Brandon-underground flushing Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 | P | CANC |
Troy Cobbley
|
|
|
Underground hydro - Brandon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in and tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 7/8/2014 | 7/8/2014 | 7/8/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground ok to cover
|
Permit Ready to Issue | | | 7/3/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 7/3/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 7/3/2014 | | 7/3/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 7/2/2014 | | 7/2/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/2/2014 | | 7/2/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/2/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/24/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 24 2014 4:51PM
|