INSP-Final Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Brandon Phone #: ###-####
|
INSP-Final Inspection | 1/6/2015 | 1/7/2015 | 1/7/2015 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Brandon Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/5/2015 | 1/5/2015 | 1/5/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 11/26/2014 | 11/26/2014 | 11/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 11/24/2014 | 11/24/2014 | 11/24/2014 | P | FAIL |
Troy Cobbley
|
|
|
Tenting inspection failed. Provide re-inspection prior to cover of pipe.
|
INSP-Sprinkler Rough-in | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Troy Cobbley
|
|
|
rough-in passed. piping can not be covered until a tenting inspection has been passed
|
INSP-Supply line flush | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | PASS |
Troy Cobbley
|
|
|
ug flush passed
|
INSP-Sprinkler Rough-in | 7/31/2014 | 7/31/2014 | 7/31/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover.
|
Plan assigned to (Tim) | 7/3/2014 | | 7/3/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/3/2014 | | 7/3/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/3/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/3/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/3/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/3/2014 | | 7/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 6/24/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 24 2014 5:27PM
|