INSP-Final Inspection | 11/25/2014 | 11/26/2014 | 11/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 11/25/2014 | 11/25/2014 | 11/25/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | PASS |
Troy Cobbley
|
|
|
ug flush passed
|
INSP-Sprinkler Rough-in | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping is ok to cover.
|
INSP-Sprinkler Rough-in | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can not be covered until the tenting inspection has been passed.
|
INSP-Sprinkler Rough-in | 7/31/2014 | 7/31/2014 | 7/31/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover.
|
Plan assigned to (Tim) | 7/3/2014 | | 7/3/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/3/2014 | | 7/3/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/3/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/3/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/3/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/3/2014 | | 7/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 6/24/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 24 2014 5:34PM
|