INSP-Final Inspection | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 | A | PART |
Troy Cobbley
|
|
|
Phase I sprinkler work complete.
|
INSP-Sprinkler Rough-in | 7/2/2014 | 7/2/2014 | 7/2/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Permit Ready to Issue | | | 6/27/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 6/27/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 6/27/2014 | | 6/27/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 6/26/2014 | | 6/26/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/26/2014 | | 6/26/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/26/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/25/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 25 2014 8:57AM
|