INSP-Final Inspection | 3/27/2015 | 3/30/2015 | 3/30/2015 | P | PASS |
Forrest France
|
|
|
Final inspection passed. Outside waterflow bell repaired.
|
INSP-Final Inspection | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | NH |
Forrest France
|
|
|
No access to complete inspection
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2015 | 3/24/2015 | 3/24/2015 | A | PART |
Forrest France
|
|
|
Completed satisfactory hydrostatic test of the new dry system piping.
|
INSP-Final Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PART |
Forrest France
|
|
|
Final Inspection above ground please call Leroy 30 min prior ###-#### Phone #: ###-#### Inspection requested via web by Jacci Hunt
|
INSP-Final Inspection | 2/3/2015 | 2/5/2015 | 2/5/2015 | P | PART |
Forrest France
|
|
|
Concluded satisfactory pneumatic test of the dry system with no pressure loss at the guage.
|
INSP-Sprinkler Rough-in | 2/3/2015 | 2/4/2015 | 2/4/2015 | P | PART |
Forrest France
|
|
|
Begin 24 hr air test of the new dry system at 43psig @ 3:15PM.
|
INSP-Sprinkler Rough-in | 1/19/2015 | 1/21/2015 | 1/21/2015 | P | CANC |
Forrest France
|
|
|
Please schedule 24 hour air test. Must be done after 3:30 pm Pls call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 1/19/2015 | 1/20/2015 | 1/19/2015 | P | CANC |
Forrest France
|
|
|
Please schedule 24 hour air test. Must be done after 3:30 pm Please call Leroy 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in/Hydro | 1/13/2015 | 1/14/2015 | 1/14/2015 | P | FAIL |
Forrest France
|
|
|
24 hr air test failed due to an 8 psi loss at the guage-
|
INSP-Sprinkler Rough-in | 1/12/2015 | 1/13/2015 | 1/13/2015 | P | PART |
Forrest France
|
|
|
Begin 24 hr air test of the new dry system -2:00PM@ 43 psig.
|
INSP-Sprinkler Rough-in | 1/8/2015 | 1/9/2015 | 1/12/2015 | P | PART |
Forrest France
|
|
|
OH rough-in of the new dry system completed satisfactory. Dry pendents at the library are not yet installed.
|
Sprinkler Plan Check | 8/20/2014 | | 8/20/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/20/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/20/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/20/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/20/2014 | | 8/20/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 7/16/2014 | | 7/16/2014 | | FAIL |
Tim Frost
|
|
|
Denied on Prescreen. Special application sprinklers were spaced incorrectly.
|
Plan assigned to (Tim) | 7/15/2014 | | 7/15/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/27/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2014 10:16AM
|