INSP-Final Inspection | 8/5/2014 | 8/5/2014 | 8/5/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 7/24/2014 | 7/25/2014 | 7/25/2014 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. Piping can be covered. The flex-heads are not locked down yet and final spacing will need to be verified.
|
Permit Ready to Issue | | | 7/1/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 7/1/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/1/2014 | | 7/1/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 6/30/2014 | | 6/30/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/30/2014 | | 6/30/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/30/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/27/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2014 11:12AM
|