INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/22/2014 | P | PASS |
Craig D. Hanson
|
|
|
System tested and pass
|
INSP-Sprinkler Rough-in | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed. Piping can be covered
|
INSP-Sprinkler Rough-in | 9/9/2014 | 9/10/2014 | 9/10/2014 | A | PASS |
Troy Cobbley
|
|
|
Tenting is complete. Piping can be covered.
|
INSP-Sprinkler Rough-in | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | FAIL |
Troy Cobbley
|
|
|
Tenting is incomplete. Piping can not be covered.
|
INSP-Sprinkler Rough-in/Hydro | 9/4/2014 | 9/5/2014 | 9/5/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydros passed. Rough-in passed. Piping can not be covered until a tenting inspection has been performed.
|
INSP-Sprinkler Rough-in/Hydro | 9/4/2014 | 9/5/2014 | 9/4/2014 | A | CANC |
Troy Cobbley
|
|
|
Ken is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Plan assigned to (Tim) | 7/1/2014 | | 7/16/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/16/2014 | | 7/16/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/16/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 7/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 7/16/2014 | | 7/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 6/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 30 2014 8:35AM
|