INSP-Final Inspection | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2014 | 9/11/2014 | 9/11/2014 | P | PART |
Forrest France
|
|
|
Completed overhead hydrostatic test of the new wet standpipe.
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2014 | 9/11/2014 | 9/11/2014 | A | PART |
Forrest France
|
|
|
Rough-in inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PART |
Forrest France
|
|
|
Completed hydrostatic testing for the dry standpipe only.
|
Sprinkler Plan Check | 9/10/2014 | | 9/10/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/10/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/10/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/10/2014 | | 9/10/2014 | | DONE |
Kristal Soland
|
|
|
|
Plan assigned to (Tim) | 7/11/2014 | | 7/18/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/18/2014 | | 7/18/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/18/2014 | | 7/18/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/18/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/18/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/2/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 2 2014 7:52AM
|
Early Start | | | 7/2/2014 | | PASS |
|
|
|
See attached
|