INSP-Final Inspection | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need signage on risers, need time on flow switches changed, need to verify bell functions. I need to walk through and verify heads.
|
INSP-Sprinkler Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Troy Cobbley
|
|
|
Tenting inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 10/14/2014 | 10/15/2014 | 10/15/2014 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. Tim is ok with the changes as per email. Piping can not be covered until a tenting inspection.
|
Miscellaneous action | | | 10/13/2014 | | PASS |
|
|
|
Received as built drawings with calculations. They are ok.
|
INSP-Sprinkler Rough-in/Hydro | 10/8/2014 | 10/9/2014 | 10/9/2014 | A | PART |
Troy Cobbley
|
|
|
Overhead hydro tests passed. Piping, as installed/rough-in passed. But routeing and fitting counts have changed and per the review notes any modifications will require resubmittals. So prior to an approval for cover being given I need plan modifications and a tenting inspection.
|
INSP-Supply line flush | 10/7/2014 | 10/8/2014 | 10/8/2014 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/27/2014 | 8/27/2014 | 8/27/2014 | P | CANC |
Troy Cobbley
|
|
|
Not ready for an inspection yet due to no piping in the trench.
|
Permit Ready to Issue | | | 7/28/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/28/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/28/2014 | | 7/28/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 7/26/2014 | | 7/26/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/7/2014 | | 7/26/2014 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/22/2014 | | PEND |
|
|
|
Contractor submitted two of the same drawings. I reviewed one before I notice the second. (There were in different folders). I asked the contractor to identify the correct drawing. The project is on hold pending this information.
|
Sprinkler Plan Check | 7/22/2014 | | 7/22/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/22/2014 | | FAIL |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/21/2014 | | 7/21/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 3 2014 11:22AM
|