INSP-Final Inspection | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Sprinkler Rough-in | 8/21/2014 | 8/22/2014 | 8/22/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
INSP-Final Inspection | 8/21/2014 | 8/22/2014 | 8/22/2014 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for final. Need to install HEPA filters.
|
Application received | | | 7/7/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 7 2014 8:24AM
|
Sprinkler Plan Check | 7/7/2014 | | 7/7/2014 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2014 | | DONE |
|
|
|
|
Plan assigned to (Scott) | 7/7/2014 | | 7/7/2014 | | DONE |
Scott Arellano
|
|
|
|
Permit Ready to Issue | | | 7/7/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/7/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/7/2014 | | 7/7/2014 | | DONE |
Tisha Gallop
|
|
|
|