INSP-Final Inspection | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work passed final inspection.
|
INSP-Sprinkler Rough-in | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed on the existing piping area. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 10/7/2014 | 10/7/2014 | 10/7/2014 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro passed
|
INSP-Sprinkler Rough-in | 9/19/2014 | 9/22/2014 | 9/22/2014 | A | PASS |
Troy Cobbley
|
|
|
Combustible concealed spaces are ok to cover. They have been filled with insulation.
|
INSP-Sprinkler Rough-in | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Troy Cobbley
|
|
|
New piping rough-in passed. I noted that new combustible concealed spaces have been formed and will need addressed before approval for cover can be given.
|
Inspection Record Card- Fire | 8/20/2014 | | 8/20/2014 | | DONE |
Christina Prado
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2014 | 7/24/2014 | 7/25/2014 | P | CANC |
Troy Cobbley
|
|
|
Mark is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
Permit Ready to Issue | | | 7/21/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 7/21/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 7/21/2014 | | 7/21/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 7/8/2014 | | 7/19/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/19/2014 | | 7/19/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/19/2014 | | 7/19/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/19/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/7/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 7 2014 11:46AM
|