INSP-Final Inspection | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | FAIL |
Troy Cobbley
|
|
|
Need to install ceiling tile and remove the shipping clips from the pendant heads
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2014 | 7/31/2014 | 7/31/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead rough-in passed and piping can be covered. Overhead hydro passed at the normal operating pressure.
|
Permit Ready to Issue | | | 7/29/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue and Print Permit | | | 7/29/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 7/29/2014 | | 7/29/2014 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 7/26/2014 | | 7/26/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/21/2014 | | 7/21/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/21/2014 | | 7/21/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/21/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/21/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2014 9:04AM
|