INSP-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 | A | PASS |
Thomas Walsh
|
|
|
Final inspection of fire service U/G supply. PASSED NOTE: Heat tracing of wet pipe bulk mains running through parking garage has been determined not to be required.
|
INSP-Sprinkler Rough-in | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | CANC |
Thomas Walsh
|
|
|
This is a rough to cover inspection for the parking garage. The contact is Mark. Thanks! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 5/21/2015 | 5/22/2015 | 5/22/2015 | P | CANC |
Thomas Walsh
|
|
|
This is for the 4th floor, Area 3 soffits. Mark is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/14/2015 | 5/15/2015 | 5/16/2015 | P | PASS |
Thomas Walsh
|
|
|
Rough in inspection of unit soffits for 4th floor section 1 area - units 400 thru 441
|
INSP-Sprinkler Rough-in | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PART |
Scott Arellano
|
|
|
Rough in.
|
INSP-Sprinkler Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | CANC |
Forrest France
|
|
|
This is an UG/Hydro inspection. Jeremiah is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line including the IBR, thrust block and stub to a point 14' beyond the stem wall approved for bury.
|
Permit Ready to Issue | | | 7/22/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/22/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/22/2014 | | 7/22/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 7/21/2014 | | 7/21/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/21/2014 | | 7/21/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/21/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2014 3:25PM
|