INSP-Final Inspection | 1/5/2015 | 1/5/2015 | 1/5/2015 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Alarm Testing | 1/5/2015 | 1/5/2015 | 1/5/2015 | P | PASS |
Forrest France
|
|
|
Verified remainder of correction items. Inspection and functional testing completed satisfactory.
|
INSP-Final Inspection | 12/30/2014 | 1/2/2015 | 1/2/2015 | A | NR |
Forrest France
|
|
|
Today's inspection rescheduled per contractor request. Initial site inspection completed 12/31- noted correction items included; relocate SD at elevator lobby second floor, provide missing strobe or revise cd setting at the first floor hallway SE end, PIV tamper switch adjustment, first floor flow switch adjustment, drawings to reflect field changes of deleted SD at patient rooms, deleted SD and HD at the elevator hoistway and deleted duct detectors. Monitoring and account information set up finished while on site 12/31 PM.
|
Telephone call | | | 12/30/2014 | | DONE |
|
|
|
Rob Ahten called to inform me that Tyco will be providing the central station monitoring and working under the existing Protex permit. No changes in method of interface to central station.
|
Issue and Print Permit | | | 8/14/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 8/14/2014 | | 8/14/2014 | | DONE |
Tisha Gallop
|
|
|
|
Alarm Plan Check | 8/11/2014 | | 8/11/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/11/2014 | | DONE |
|
|
|
Plans approved with review comments and requirements. Projectdox updated.
|
Plan resubmittals received | | | 8/8/2014 | | DONE |
|
|
|
|
Application received | | | 7/9/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2014 10:54AM
|
Plan assigned to (Lee) | 7/9/2014 | | 7/9/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/9/2014 | | FAIL |
|
|
|
Plans returned on prescreen review. Legend does not match plan symbols, missing North arrow, ceiling height not provided, one strobe needs relocation or candela increase, no calculations provided.
|