INSP-Final Inspection | 2/17/2015 | 2/17/2015 | 2/18/2015 | P | PASS |
Tim Frost
|
|
|
Verified previous correction items. Final inspection and functional testing passed. Permit finaled.
|
INSP-Final Inspection | 10/16/2014 | 10/22/2014 | 10/22/2014 | P | FAIL |
Forrest France
|
|
|
C/N items include; provide tamper switch at the PIV, repair outside waterflow bell, provide knox box, relocate SD used for door release service at the 2nd floor level, basement level lobby SD did not initiate elevator recall, fire hat flash is not functional. Refer to plan review notes items #3,8,12,13,23 for details.
|
INSP-Final Inspection | 10/2/2014 | 10/3/2014 | 10/3/2014 | P | DEFR |
Forrest France
|
|
|
|
Alarm Plan Check | 9/11/2014 | | 9/11/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/11/2014 | | DONE |
|
|
|
Plans approved with review comments and notation. Projectdox updated.
|
Permit Ready to Issue | | | 9/11/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/11/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/11/2014 | | 9/11/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 9/3/2014 | | DONE |
|
|
|
|
Telephone call | | | 8/12/2014 | | DONE |
|
|
|
The owner's rep called to say that they are looking at using another contractor for their fire alarm replacement panel. She wanted to know what the code requrements were that applied to their building.
|
1st review completed | | | 7/11/2014 | | FAIL |
|
|
|
See 1st review comments
|
Application received | | | 7/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2014 8:52AM
|
Plan assigned to (Lee) | 7/10/2014 | | 7/10/2014 | | DONE |
Lee G Meredith
|
|
|
|