INSP-Final Inspection | 8/29/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Forrest France
|
|
|
Fire alarm permit work passed inspection. Final approved.
|
Plan assigned to (Lee) | 7/30/2014 | | 7/30/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/30/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 7/30/2014 | | 7/30/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/30/2014 | | DONE |
|
|
|
Plans approved with with conditions noted on drawings and in the review comments. Projectdox updated.
|
Miscellaneous action | | | 7/30/2014 | | DONE |
|
|
|
Plans and documents uploaded.
|
Permit Ready to Issue | | | 7/30/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 7/30/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 7/30/2014 | | 7/30/2014 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 7/30/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Miscellaneous action | | | 7/25/2014 | | DONE |
|
|
|
Plans failed on pre-screen review. Application was correct but the drawings and checklist that were uploaded indicated that they wwer for another project. Ken Webster called to indicate that he had uploaded the wrong set and would upload the right ones when the project was reopened.
|
Miscellaneous action | | | 7/15/2014 | | DONE |
|
|
|
Emailed applicant to let them know that drawings and documents had not been uploaded to eplanreview yet and that review could not start without them. Applicant responded indicating that the upload was not ready yet.
|
Application received | | | 7/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2014 8:55AM
|