INSP-Final Inspection | 11/17/2014 | 11/18/2014 | 11/18/2014 | P | PASS |
Forrest France
|
|
|
Inspection and functional testing passed. Permit finaled.
|
Permit Ready to Issue | | | 11/17/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/17/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/17/2014 | | 11/17/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 11/13/2014 | | 11/13/2014 | | DONE |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 11/13/2014 | | 11/13/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/13/2014 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Miscellaneous action | | | 11/12/2014 | | DONE |
|
|
|
Documents and drawings uploaded to projectdox.
|
Miscellaneous action | | | 11/3/2014 | | DONE |
|
|
|
I requested a status update from the applicant via email.
|
Miscellaneous action | | | 8/5/2014 | | DONE |
|
|
|
Drawings and documents uploaded.
|
Miscellaneous action | | | 8/5/2014 | | FAIL |
|
|
|
Submittal failed prescreen review. Numerous strobes had incorrect candela setting on floor plans. Showers and locker rooms require weatherproof notification and weatherproof notification product data. I notified the applicant via email of resubmittal requirements.
|
Miscellaneous action | | | 7/15/2014 | | DONE |
|
|
|
Emailed applicant to let them know that drawings and documents had not been uploaded to eplanreview yet and that review could not start without them. Applicant responded indicating that the upload was not ready yet.
|
Application received | | | 7/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2014 9:05AM
|