INSP-Final Inspection | 10/7/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/6/2014 | 10/7/2014 | 10/7/2014 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Mike is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead rough-in and tenting inspection passed and piping can be covered. Overhead hydro tests passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2014 | 8/22/2014 | 8/22/2014 | P | CANC |
Troy Cobbley
|
|
|
Mike M is going to reschedule for monday
|
(F) Reprint permit | | | 8/12/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 8/12/2014 | | 8/12/2014 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 7/22/2014 | | 7/22/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/22/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/22/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 7/22/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 7/22/2014 | | 7/22/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 7/11/2014 | | 7/11/2014 | | DONE |
Scott Arellano
|
|
|
|
Application received | | | 7/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2014 12:58PM
|