INSP-Final Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 8/18/2014 | 8/18/2014 | 8/18/2014 | A | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler work.
|
INSP-Sprinkler Rough-in | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications okayed for cover at the drop ceilings.
|
Permit Ready to Issue | | | 7/18/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/18/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/18/2014 | | 7/18/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 7/17/2014 | | 7/17/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/17/2014 | | 7/17/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/17/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 11 2014 3:29PM
|