INSP-Final Inspection | 9/3/2014 | 9/3/2014 | 9/3/2014 | P | PASS |
Forrest France
|
|
|
Final walkthrough passed. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PART |
Forrest France
|
|
|
Sprinkler final pending installation of field ceiling tile. Remainder of walkthrough passed.
|
INSP-Final Inspection | 8/14/2014 | 8/15/2014 | 8/15/2014 | A | PASS |
Craig D. Hanson
|
|
|
Rough in 1st floor. pass
|
Plan assigned to (Tim) | 7/23/2014 | | 7/23/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/23/2014 | | 7/23/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/23/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/23/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 7/23/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 7/23/2014 | | 7/23/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 7/16/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 16 2014 9:19AM
|